Introduction
Sign-Offs is used to acknowledge project closure or, project delivery such as:
1. Project goals and their status
2. Project timeline
KTern provides an interactive platform where the views can be altered and accessed according to the ease of the user.
1. View
Sign-Offs can be viewed in three different ways :
Access the actions button on the Sign-off list
1.1 Action based view
1.2 Approvers based view
Related Articles
How can a child signoff be created under a parent signoff?
In the Explorer View, navigate to the necessary signoff item. Under the parent signoff item, the user should click on "+ Add Sign Off Item." Subsequently, a drawer will open, where the user must fill in the details in the Overview section. The ...
How to Clone and Create Signoffs in KTern?
The "Clone and Create" feature in KTern helps reduce time by streamlining the creation of signoffs, ensuring unique signoffs are created while linking the Project Plan and GSI (Global Scope Items). This structured method ensures smooth signoff ...
Where can i see overdue sign offs ?
Introduction KTern allows the user to create and assign sign-offs based on the project requirements. While a sign-off is being created, the user have to provide the deadline for approval / rejection of the sign-off. Since the platform doesn't allow ...
Is it possible to group the signoffs by role, team, and level?
Yes, it is possible to group the signoffs. In the "Tree View," the user can see a list of all signoffs present in the project. (i). Signoffs grouped based on the role of the approver: (ii). Signoffs grouped based on the team of the approver: (iii). ...
How to Request Re-Approval for Sign offs in KTern?
Challenges in Obtaining Re-Approvals for Rejected or Reworked Sign Offs Obtaining re-approvals for rejected or reworked sign offs is one of the most challenging aspects of the project. Moreover, changes made to address the concerns of one rejected ...