How can i link my project plan to a sign off ?

How can i link my project plan to a sign off ?

Introduction

KTern as a platform aims to provide the users with a unified single digital workspace and complete transparency is maintained. The idea of inter-linking of project items ensure easy back tracking into the project plan & the relevancy with reference to the project plan.



A sign-off can be linked with a project plan with the reference of the task while a sign-off is being created by the user.
A sign-off can be linked using :
  1. Task
  2. Issue
  3. Test Case
  4. Milestone

1. References




1.1 KTern allows the user to create multiple references.



1.2 The multiple reference items can be of different types.



1.3 The reference items assigned can be different based on the type & sign-off item.



Check Out more about Sign-offs at How can i design a sign-off workflow?


    • Related Articles

    • How to Clone and Create Signoffs in KTern?

      The "Clone and Create" feature in KTern helps reduce time by streamlining the creation of signoffs, ensuring unique signoffs are created while linking the Project Plan and GSI (Global Scope Items). This structured method ensures smooth signoff ...
    • How can I design a sign off workflow ?

      Introduction KTern offers the user to assign and create sign-off based on the project requirement. The sign-off workflow starts from creating the sign-off to closing after the last approval of the approval matrix. The Sign-off workflow includes ...
    • How to Simplify Your Workflow by Cloning and Creating Signoffs in KTern?

      1. The "Clone and Create" feature in KTern helps reduce time by streamlining the creation of signoffs, ensuring unique signoffs are created while linking the Project Plan and GSI (Global Scope Items). This structured method ensures smooth signoff ...
    • Where can i see overdue sign offs ?

      Introduction KTern allows the user to create and assign sign-offs based on the project requirements. While a sign-off is being created, the user have to provide the deadline for approval / rejection of the sign-off. Since the platform doesn't allow ...
    • How do i get notified about sign offs ?

      Introduction KTern allows the user to create a sign-off and assign stakeholders to the same based on the approval matrix. The approval matrix can be of multiple levels with multiple approvers at each level. To increase the efficiency of the sign-off ...