Ilavenil Release - 2503 ( 24 March, 2025 )
What’s New!
Digital Audit
- Quality Audit with Workflows
- A new Digital Audit module has been introduced. It includes two components—New Audit Log and New Audit Report—each opening in a separate tab similar to the Planner.
- The Audit Log captures audit statuses, action plans, and due dates, along with dynamic calculations for Audit.
- The Audit Report provides detailed analytics on process adherence, non-compliance, overdue metrics, and RAG status, with configurable levels and drill-down capabilities. A download option is available, and the log displays all active phases.
Digital Maps
- Sizing Recommendations for System Landscape (DEV, QAS, PRD)
- Sizing recommendations were introduced for DEV, QAS, and PRD systems based on the scanned “as-is” landscape. The enhancement ensures that the proposed “to-be” sizing is accurate, validated, and aligned with industry best practices
Enhancements & Bug Fixes!
Digital Projects
- Custom Boards - Data Loss Issue during the copy paste functionality
- Fixed an issue where filters were not working for several custom fields Custom Boards - Filters were not working for custom fields
- Custom Boards - Activity Status & Views Update Issue Fixed
- Resolved a problem where users were unable to update activity statuses. Saved views and default board views now persist correctly after refresh.
- Custom Boards - Copy-Paste Data Loss Issue Resolved
- Fixed a critical issue where copy-pasting in custom boards retained only a few columns (Title and Status), and existing data rows were getting erased post-paste.
- Planner - Milestone Date Sync
- Corrected the logic to ensure milestone dates now update in sync with changes to their corresponding parent task’s end date.
- Planner - Decimal Duration & Slack Days Adjusted
- Fixed formatting issues where task duration and slack values were displaying as decimals, making critical path setup difficult.
- Planner - Memory Leak Issue
- Fixed a memory consumption issue in the Planner where extended usage caused the Chrome tab to become unresponsive due to memory overload.
- Project Planner - Vertical Lines for Past Dates
- Introduced visual separators in the Gantt view to mark the transition between past and upcoming tasks.
- Project Planner - Copy-Paste Restored in All Levels
- Enabled copy-paste support across all planner levels, preserving full task data