How long does the transport analysis take?
The transport analysis run timeline totally depends on the volume of the analysis. There are various parameters that influence the Change Impact Mining -
- No. of transports
- No. of objects in each transport
- System data volume
- Network bandwidth and stability
- No. of testcases in the test repository
In general, once the bots are launched for the Change Impact Mining, it takes 5 hours on an average to analyze 10 transports comprising a total of 1000 objects for an 1500 GB SAP System.